Skip to content
PAIR
EN
Request a demo Demo
An inspector crouched over the reinforcement of a slab, photographing the mesh before the pour.

Industries · Construction and erection

What gets covered today has to be provable ten years from now.

Article 18 of the Chilean Urban Planning and Construction Act makes the first-seller owner liable for load-bearing structure defects for ten years from final acceptance. Today that proof is a photo of a paper protocol in a WhatsApp group.

What happens today

  • The concrete protocol is filled on site, signed, photographed and sent by WhatsApp. The photo gets compressed and the specimen number stops being legible.
  • The inspector’s observation is closed out, but the evidence that it was closed lives in three separate emails and an undated photo.
  • The final acceptance file is assembled two weeks before handover, hunting for paperwork from two years ago.

Five concrete jobs, with the role that does them today

  1. 01

    Concrete pour protocol and specimen traceability

    Who does it today
    The site manager, on every pour.
    What is left
    The delivery note, the slump and every specimen number, tied to the element on the floor plan.
  2. 02

    Weld log and non-destructive testing

    Who does it today
    The quality inspector, joint by joint.
    What is left
    The joint with its welder, its test and its result. The welder’s identity is masked according to who is looking.
  3. 03

    Technical inspector visit: minutes, observations and evidence

    Who does it today
    The technical inspection of works, on every visit.
    What is left
    The minutes with their observations, their closure deadline and the photographic evidence that it was closed, with a date.
  4. 04

    Punch list and handover of areas

    Who does it today
    The site administrator, room by room.
    What is left
    The state of every room on the floor plan, and the handover record that writes itself.
  5. 05

    Final acceptance file for the building authority

    Who does it today
    The contract administrator, at the end.
    What is left
    All of the above, ordered by date and by element, exported as a file. It is not assembled: it was already assembled.

What you will be asked for, and where it comes from

Liability for the structure lasts ten years. The evidence of how it was built has to last just as long.

What the regulation requiresWhat evidence PAIR produces
LGUC art. 18 First-seller liability Answer for load-bearing structure defects for ten years from final acceptance. Every element with its protocol, its record with its coordinate and its time and its date, stored per element and exportable ten years later.
DS 44/2024 arts. 72 and 73 Record of preventive activity Keep evidence of preventive activity and of who was responsible, «preferably in electronic format», with place, date, time, people involved, description and cause. Toolbox talks with attendee signatures, PPE handover with signature, and work-at-height and hot-work permits.
Law 20.123 arts. 183-A to 183-AE of the Labour Code Subcontracting The principal company answers for the safety conditions of contractors and subcontractors on its site. Data separated per company, reports branded for each client and a single history for the principal company.
Law 21.719 · Law 19.628 arts. 3 and 14 quinquies Personal data protection Process personal data on a lawful basis, minimise it and answer for its security. Names and national IDs masked according to who is looking, on export too. Faces redacted with the product’s own function.

The bodies named are the regulators. PAIR neither represents them nor carries their endorsement.

What you start with

A few, built for this trade, ready to edit. If your site already has its own, better: it gets digitised as it is and comes out the same.

  • Concrete delivery and pour protocol, with delivery note, slump and specimen traceability
  • Weld log and non-destructive test record
  • Technical inspection visit minutes, with observations and deadline
  • Non-conformance with cause, photographic evidence and closure deadline
  • Punch list per room, for handover to the client
  • Structural erection protocol: plumbness, alignment and bolted connection torque
  • Scaffold and lifeline inspection
  • Work-at-height permit and hot-work permit
PAIR 3D level view: each floor of the facility with its findings pinned.

Demo

Bring us one of your protocols

The PDF or the scan of a protocol your site uses: in thirty minutes you will see it digitised, with your own letterhead and your own checkboxes.

  • Would you rather look at the plans first? See pricing.
  • Still have questions? Check the FAQ.

We only use these details to get in touch. This site loads no third-party resources. Privacy policy