Industries · Public works

The inspector never saw that pay item. The whole month bounces back.

The monthly payment statement depends on a work-progress record signed and dated by the government inspector. PAIR digitises your quantity survey sheet and your laboratory protocol exactly as they are on paper, fills them with no signal and puts a coordinate and a time on every photo.

What happens today

  • The whole monthly payment statement comes back over a single pay item: the government inspector says he never saw that stabilised base, and there is no way to show him where or when it was built.
  • The in-situ density protocol is filled by hand on the lab sheet and someone types it into Excel at night, so that the P.I.C.E. percentage is ready on the 28th.
  • The claim for the utility clash that was never surveyed is assembled eight months later, with undated photos and the memory of people who no longer work on the job.

Five jobs from the contract, with the role that does them today

  1. 01

    The monthly quantity survey, on the plan and by chainage

    Who does it today
    The technical office manager, with the site manager and the surveyor.
    What is left
    Every point of the pay item with its latitude, its longitude and its time, and the PDF that is attached to the payment statement.
  2. 02

    The P.I.C.E. points reported every month

    Who does it today
    The quality manager and the field laboratory technician, test by test.
    What is left
    The lab sheet with range validation on the result, and the percentage within tolerance computed on the field, not on free text.
  3. 03

    The daily standing-time record, for the claim

    Who does it today
    The site engineer, on the day the crew stops.
    What is left
    Crew, equipment, hours and cause, with a photo with its coordinate and its time, chained: if one link is altered, the chain stops closing and the system says so.
  4. 04

    The structure inspection, opened level by level

    Who does it today
    The bridge inspection engineer, or the consultant advising the government inspector.
    What is left
    The damage marked on the exact pier or abutment, and the next inspection task created on its own from the structure's rating.
  5. 05

    The service-level round, from chainage to report

    Who does it today
    The maintenance manager of the concession or of the global contract.
    What is left
    The pothole as a point with its chainage, and a closure that requires the after photo at the same point.

What the contract requires, and where the evidence is stored

The Libro de Obras — the official site log — is opened and signed by the government inspector, and PAIR neither replaces it nor issues advanced electronic signatures. What it produces is the written evidence you write the entry from: the measurement, its photograph, its coordinate and its time.

What the regulation requiresWhat evidence PAIR produces
DS MOP 75/2004 art. 110 The Works Book The government inspector keeps a folioed Works Book in triplicate, which the contract terms may establish as digital. Only the inspector writes in it, every order is acknowledged with name, signature and date on the folio, and all written communication between inspection and contractor becomes an annexed record to the Book. The Works Book belongs to the government inspector and only they write in it. PAIR is not the Works Book and does not replace it: it produces what gets annexed to it. PAIR produces those annexed records: the field entry with its author, its time and its photographs, exported as the PDF that accompanies the reply to each entry.
DS MOP 75/2004 arts. 153 and 154 What you need before a payment certificate can be issued It is a prior requirement to hand the inspector the records proving there are no debts to workers for wages, social security, Law 16.744 contributions or withheld taxes, extended to subcontractors and service providers. And the payment certificate is issued against a progress statement signed and dated by the inspector. The quantity survey measured on the anchored plan, by chainage, with a photo carrying its coordinate and capture time, and the same PDF attached to the payment certificate. PAIR does not value or issue the certificate: it produces the evidence of progress.
DS MOP 75/2004 art. 143 (3) Monthly workforce list Hand the inspector, within five days of the month reported, the list of workers active on site, including those of subcontractors, with a fine of 1 UTM for each day late. That list is not paperwork: if the contractor fails to pay wages, art. 131 empowers the inspector to pay the workers out of pending payment certificates, and does so on the basis of it. Attendance comes out of the field record, separated by contractor, with names and national IDs masked according to who is looking, on export too.
DS MOP 75/2004 arts. 179 to 181 Grading of the contractor Once the works are finished, the reception board grades the contractor with a single mark from 1 to 7 — quality, deadlines, contract terms and risk prevention — and that mark goes to the General Register of Contractors to be entered in the company record. The board relies on the entries in the Works Book and on the inspector’s reports. And since 27 February 2026, art. 101 ter adds a statement of each subcontractor’s performance — good, fair or poor — also assessed from the entries in the Works Book. The full history of the works, by pay item and by period, with what was answered to each observation and when. It is what backs a written reply to an entry that is going to end up in the company record.
DS 44/2024 art. 72 Documentary backing of preventive activity Record and back up, documentarily and faithfully, all information linked to occupational risk management, and keep it, preferably in electronic format, available to the enforcement body and the insurance administrator. It applies to every employer, whatever their sector or size. DS 44 says «preferably in electronic format», not «mandatory». And DS MOP 75 has allowed a digital Works Book since 2008, but only where the contract terms establish it. Every inspection with its form, its owner, its fill date and its arrival date on the server, exportable by period.
DS 76/2006 art. 5 Site records Keep on site an up-to-date record, on paper and/or digital, with the tax ID and company name of every contractor and subcontractor, their works supervisor, their headcount and their start and end dates, plus the risk assessment reports and the inspection records of the enforcement bodies. The record by contractor, available on site when required, with the tax ID asked for where the regulation requires it and not by default.

The bodies named are the regulators. PAIR neither represents them nor carries their endorsement.

What you start with

Built for a Chilean public works contract. If your contract already has its own format, it gets digitised as it is and comes out with the same letterhead and the same checkboxes.

  • Quantity survey sheet per pay item and per chainage, with photographic evidence
  • In-situ density protocol, with range validation on the result
  • Hot mix asphalt temperature and compaction control
  • P.I.C.E. control point with its tolerance and the material certificate attached
  • Daily standing-time record: crew, equipment, hours and cause
  • Principal bridge inspection checklist, per structural element
  • Service-level round by chainage: potholes, signage, lighting and guardrails
  • Monthly roster of workers and subcontractors for the government inspector
PAIR 3D level view: each floor of the facility with its findings pinned.

Demo

Bring us your quantity survey sheet

A quantity survey sheet or an inspection checklist your contract uses: in thirty minutes you will see it digitised and filled from a phone, with no signal.

  • Would you rather look at the plans first? See pricing.
  • Still have questions? Check the FAQ.

We only use these details to get in touch. This site loads no third-party resources. Privacy policy