Skip to content
PAIR
EN
Request a demo Demo
Two contractor technicians work on an open heat exchanger at the client’s plant.

Industries · Industrial services and maintenance

The plant is the client's. The proof has to be yours.

Your people work inside someone else’s plant, with that someone else’s form and with no signal. PAIR digitises each client company’s form exactly as it is — same letterhead, same checkboxes — it gets filled on their plant plan, and the approval carries the server’s timestamp.

What happens today

  • Five client companies, five formats for the same job: one wants a before-and-after photo, the next wants the notification number, the third sends an Excel file with macros. In the office someone’s whole job is transcribing.
  • The monthly progress payment stalls because the evidence for one line item is missing, and the argument with the client’s contract administrator runs by email, with loose photos that do not say where or when they were taken.
  • Everything was uploaded to the client’s portal. The day the contract ends the access ends, and the proof of what you did stays on the other side.

Five contractor jobs, with the role that does them today

  1. 01

    The same job, five client company formats

    Who does it today
    The contract supervisor, and the technical office clerk who transcribes today.
    What is left
    The PDF with the letterhead, the checkboxes and the numbering of whichever client it belongs to, out of the same field entry.
  2. 02

    The observation raised by the client’s safety officer

    Who does it today
    The contractor’s own risk prevention expert, and the front-line foreman who has to close it out.
    What is left
    Every observation with its deadline and its owner on the plant plan, by level, and the closure photo with its coordinate and its time.
  3. 03

    The quantity evidence behind the progress payment

    Who does it today
    The contract administrator, with the technical office, at every monthly cut-off.
    What is left
    Metres, welds and machine hours inside the same field form, with the photo next to the number. PAIR does not price or issue the progress payment: it produces the evidence.
  4. 04

    Handover and return of the area they lent you

    Who does it today
    The site supervisor, with the client’s area owner who releases the equipment.
    What is left
    Both records signed on the phone, in the same unit’s equipment log, with a photo carrying its coordinate and its time at each end.
  5. 05

    Quoting a plant shutdown you saw once

    Who does it today
    The proposals engineer, before the contract exists.
    What is left
    A navigable walkthrough of the installation with findings anchored, so you quote by looking, not by remembering. PAIR 360 is in the Enterprise plan.

What they demand of you from the other side, and where it comes from

The special rules your client company applies to you do not come out of nowhere: they come out of article 66 bis. No program enforces those rules. What a program can do is make sure the evidence exists, is dated, and does not have to be reconstructed.

What the regulation requiresWhat evidence PAIR produces
Ley 16.744 art. 66 bis Special rules for contractor companies Whoever contracts work belonging to their own line of business must oversee compliance with the regulations by contractors and subcontractors, and implement an occupational health and safety management system when together they group more than 50 workers. The special rules set out the verification mechanisms and the applicable sanctions. Every client observation as a finding with its deadline and its owner, and its closure with a geotagged photo and an approval carrying the server’s timestamp.
DS 76/2006 art. 5 Site record of contractor documentation The principal company keeps on site an up-to-date record «en papel y/o soporte digital» — on paper and/or in digital form — including risk assessment reports, the visits and measures prescribed by the insurance administrators, and the inspection minutes of the regulators. What the contractor hands over for that record comes out already dated, with its owner identified and filtered by contract, with nobody assembling it on the Friday.
DS 44 art. 72 Documentary backing of preventive management Record and back up in documentary and faithful form all information tied to occupational risk management, and keep it «preferentemente en formato electrónico» — preferably in electronic format — available to the regulator and to the insurance administrator. The electronic file of the whole contract, by period and by site, with the fill time and the server arrival time on every record, exportable the day it is asked for.
Ley 21.719 · Ley 19.628 arts. 2 f) and 3 c) National ID and proportionality The national identity card number is one of the identifiers that make a person identifiable, and only data that is necessary, adequate and pertinent to the purpose may be processed. It comes into force on 1 December 2026. Names and national IDs masked according to who is looking, on export too. The client company sees the evidence of the work without keeping the roster of your people.

The bodies named are the regulators. PAIR neither represents them nor carries their endorsement.

What you start with

Built for the work of a Chilean contractor, and adjusted to each client company’s format. If your client already has its own, you upload the scan and it comes out identical, with their letterhead.

  • Maintenance report with quantities per line item and the client’s sign-off signature
  • Handover and return record for an area or a unit released for intervention
  • Client observation close-out, with deadline and owner
  • Work-at-height, hot-work and confined space permit
  • Lockout and tagout record, with a photo of the padlock and the tag
  • Pre-use check for truck-mounted crane, forklift, generator and compressor
  • Quarterly inspection of slings, chokers and lifting gear, with the colour code
  • Scaffold acceptance and condition, with the tagging card
  • Notification of occupational risks, DS 44 art. 15, with the worker’s signature
PAIR records table with filters, one column per field and Excel export.

Demo

Bring us two forms from two client companies

Two maintenance reports you are required to file today, from two different client companies: in thirty minutes you will see them digitised, each with its own letterhead, and filled from a phone with no signal.

  • Would you rather look at the plans first? See pricing.
  • Still have questions? Check the FAQ.

We only use these details to get in touch. This site loads no third-party resources. Privacy policy